[ 3 / biz / cgl / ck / diy / fa / ic / jp / lit / sci / vr / vt ] [ index / top / reports ] [ become a patron ] [ status ]
2023-11: Warosu is now out of extended maintenance.

/sci/ - Science & Math

Search:


View post   

>> No.2714180 [View]
File: 55 KB, 450x329, 1256467537755.gif [View same] [iqdb] [saucenao] [google]
2714180

Unit 4 (shut down due to regular inspection)
- Reactor has been shut down and sufficient level of reactor coolant
to ensure safety is maintained.
- Currently, we do not believe there is any reactor coolant leakage
inside the reactor containment vessel.

Unit 5 (outage due to regular inspection)
- Reactor has been shut down and sufficient level of reactor coolant
to ensure safety is maintained.
- Currently, we do not believe there is any reactor coolant leakage
inside the reactor containment vessel.

Unit 6 (outage due to regular inspection)
- Reactor has been shut down and sufficient level of reactor coolant
to ensure safety is maintained.
- Currently, we do not believe there is any reactor coolant leakage
inside the reactor containment vessel.

Reactor 2 had a partial contaimnet loss and the spent fuel pool at reactor 4 caught fire. The fuel pool being currently the most significant source of contamination.

Reactors 1 and 3 are still contained, and if they do breach it, it will most probably be into the fuel traps under them which is constructed just for that exact purpose.

Annually, there's more contamination of homes from radon in high-granite basement areas or particles let fly at mining operations of uranium.

Navigation
View posts[+24][+48][+96]