[ 3 / biz / cgl / ck / diy / fa / ic / jp / lit / sci / vr / vt ] [ index / top / reports ] [ become a patron ] [ status ]
2023-11: Warosu is now out of extended maintenance.

/sci/ - Science & Math

Search:


View post   

>> No.15901299 [View]
File: 187 KB, 694x783, GATqZv0b0AAhWPu.jpg [View same] [iqdb] [saucenao] [google]
15901299

>>15901296
> "SpaceX will conduct its payload testing activities during the launch and early orbit phase (“LEOP”) of the satellites’ mission. During the critical check-out phase, which will begin within hours of launch at an altitude between 290 km and 350 km—depending on the particulars of the specific launch—and will continue for several weeks for each satellite, SpaceX will test the functionality of each direct-to-cellular payload and its network capabilities to ensure that they are operating as intended. Permitting this initial, internal LEOP check-out testing over several weeks (or longer as necessary) for each satellite is critical to assess and address issues as they arise."
>Then eventually they will transition to the previously filed STA on October 2nd. for wide-spread testing with TMobile.
>SAT-STA-20231002-00240
>"Direct-to-cell STA to launch and test its non-geostationary orbit NGSO second generation Gen2 satellites with direct-to-cellular communications payloads to connect unmodified cellular phones directly to SpaceX Gen2 satellites"
Every D2D operator that will provide service to the US will require authority to launch from the FCC

Navigation
View posts[+24][+48][+96]