[ 3 / biz / cgl / ck / diy / fa / ic / jp / lit / sci / vr / vt ] [ index / top / reports ] [ become a patron ] [ status ]
2023-11: Warosu is now out of extended maintenance.

/diy/ - Do It Yourself

Search:


View post   

>> No.2396211 [View]
File: 990 KB, 3073x2048, rH6dTP9.jpg [View same] [iqdb] [saucenao] [google]
2396211

>taking a rod of copper, connecting multimeter probe on it
>connecting 2nd multimeteer probe to Ground
>measuring AC Voltage
>Multimeter climbs up to 12V

>Connects the rod to 3rd oscilloscope's probe
>Connects 2nd oscilloscope's probe to a bench PSU, on Building Electricity line (1)
>Connects 2nd oscilloscope's probe to a bench PSU, on Building Electricity line (2)
>Line (1) and (2) are well presenting 2 phases and their shift from the distributing 3-phased cable outside
Rod is measuring a 50Hz signal around 4V amplitude.. not in phase with any of the building's lines.
>Shutting down both power lines of the building, and the rod continue to display same figures
wtf is this leakage. Producing stress in the body. How can I trace it further ?

Navigation
View posts[+24][+48][+96]